Overrun causations under advance payment regimes

Author:

Aje Olaniyi Isaac,Olatunji Oluwole Alfred,Olalusi Olanrewaju Augustine

Abstract

Purpose Evidence suggests project owners could use advance payments to prevent cost escalations. The purpose of this paper is to elicit the relationships between causations of overruns when advance payments are issued to contractors. Design/methodology/approach In total, 97 responses from a questionnaire survey were analysed. Additional data on 51 projects, completed between 2000 and 2014 under different advance payments regimes, were also obtained and analysed. Findings Project owners issue advance payments to contractors so as to avoid delays. However, statistical correlation between advance payments and overrun causations are not significant. Although cost overruns were higher in large projects than in small projects, schedule overruns were more in small projects than in large projects. Schedule overruns were caused most significantly by contractors’ site management approaches. Design and documentation issues were identified as the most prevalent cause of cost overruns. Regression models are proposed to elicit overruns when advance payments are issued. Practical implications Extant debates on project overruns in construction and project management literature are robust. Nonetheless, the study elicits considerable knowledge gaps regarding the roles of advance payments in fostering project performance. Originality/value This pioneering work indexes the relationship between advance payment and project overruns in Nigeria. It is also the first attempt to document the probability distribution of overruns in Nigeria, particularly under specific advance payment regimes.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference47 articles.

1. Abeysekera, V. (2002), “Re-engineering payment procedures: an agenda for client financed construction”, in Ng, S.T., Cheung, S., Lam, K. and Poon, S. (Eds), Re-Engineering Construction: Enabling and Motivating Excellence, Professional Publication Ltd., Hong Kong, pp. 79-85.

2. Spotlight on construction cost overrun research: superficial, replicative and stagnated,2015

3. The impact of contractors’ management capability on cost and time performance of construction projects in Nigeria;Journal of Financial Management of Property and Construction,2009

4. Automated construction site layout generation using RFID-RTLS system;Structure and Infrastructure Engineering,2016

5. The concept of project complexity – a review;International Journal of Project Management,1996

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Modelling the domino effect of advance payment system on project cash flow and organisational performance;Engineering, Construction and Architectural Management;2023-10-16

2. Choosing to be a craftsperson: factors influencing career decision-making among apprentices;Engineering, Construction and Architectural Management;2022-02-16

3. Impact of mobilization costs on schedule performance of highway projects;Engineering, Construction and Architectural Management;2022-02-14

4. Attributes and impact of advance payment system on cash flow, project and organisational performance;Journal of Financial Management of Property and Construction;2021-11-23

5. Critical success factors of strategy-led planning of high-profile projects;International Journal of Construction Management;2020-12-02

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3