Purpose The purpose of this study is to determine whether there is a correlation between mobilization costs and project schedule performance of highway projects. In addition to this, the study will also determine if the mobilization costs are helping small or large highway projects in terms of improving the schedule performance. Design/methodology/approach The data of 206 highway projects were collected from the Department of Transportation of two states with the help of questionnaire survey. The cost, schedule and mobilization costs data were collected. The performance metrics related to construction schedule growth and construction intensity were developed in order to test the research hypotheses: mobilization costs will increase the schedule performance of highway projects. The data were also divided into two groups based on project cost and analyzed to check whether the mobilization costs impact the schedule performance of these highway projects. Spearman's correlation test was conducted to determine the correlation between dependent and independent variables. In addition, a Mann–Whitney test was conducted to determine the difference in medians of construction schedule growth and the construction intensity of these two groups of projects. Findings One major study finding was that there was no strong linear correlation between the mobilization cost percentage and the construction schedule growth and construction intensity of highway projects. However, the study found the projects that have 9% or more mobilization costs had significantly better schedule growth compared to the projects that have less than 9% mobilization costs. When data were analyzed based on the project size, it was found that this pattern was seen only in large projects costing equal to or more than $5 million. Practical implications This study's findings have very crucial practical implications to state DOTs contract engineers. This study shows that the highway contract engineers need to provide the right amount of mobilization costs to complete their projects on and before schedule. If the correct amount of mobilization costs is not provided to the contractors, the impact of these mobilization costs on reducing the schedule growth will be negligible. The findings of this study will assist public agency decision makers to complete their projects on or before time by including the mobilization costs provision in the contract. The state DOTs can improve their schedule performance by providing enough financial help to the contractors so that they can improve their cash flows and complete projects successfully within the given timeframe. Originality/value This paper contributes to the existing body of knowledge by validating the impact of mobilization costs on the schedule performance of highway projects. There has been no empirical study conducted prior to this to identify the role of mobilization costs on reducing the schedule growth of highway projects.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference30 articles.

1. Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects;Engineering, Construction and Architectural Management,2019

2. Overrun causations under advance payment regimes;Built Environment Project and Asset Management,2017

3. Causes of delays in Saudi Arabian public sector construction projects;Construction Management and Economics,2009

4. Causes of delay in large construction projects;International Journal of Project Management,2006

5. Empirical study of schedule delay in Moroccan construction projects;International Journal of Construction Management,2020

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3