1. Abeysekera, V. (2002), “Reengineering payment procedures: an agenda for client financed construction”, in Ng, S.T., Cheung, S., Lam, K. and Poon, S. (Eds), Re-Engineering Construction: Enabling and Motivating Excellence Hong Kong, Professional Publication Ltd., pp. 79-85.
2. Abubakar, A. (2004), “Advance payment and performance bond: management and administration”, A paper presented at the 2-day seminar on Contract Administration and Management organised by the Nigerian Institute of Quantity Surveyors at Lagos Airport Hotel, Ikeja, Lagos, Nigeria.
3. Exploring the significant cash flow factors influencing building projects profitability in Ghana;International Journal of Construction Engineering and Management,2018
4. Factors affecting the performance of construction projects in the Gaza Strip;Journal of Civil Engineering and Management,2009
5. Post occupancy evaluation of school refurbishment projects: multiple case study in the UK;Buildings,2021