Modelling the Implications of Delayed Payments on Contractors’ Cashflows on Infrastructure Projects

Author:

Chadee Aaron,Ali Hanna,Gallage Sihara,Rathnayake Upaka

Abstract

The consideration of payments to contractors is not only a legal obligation but a necessity for assuring the continuity and completion of a construction project. However, consistent payments to facilitate project cash flows are uncommon in the construction industry. Within the context of a small island developing state, this paper aims to uncover leading risks factors the contributing to implications of delayed payments, on contractors’ cash flows and uncover any causalities and effects on relationships among these factors. A two-tiered quantitative approach was adopted. Firstly, a compiled list of delay factors was collated from the literature review. Semi-structured interviews were conducted with experienced construction professionals to determine the factors’ relevance and applicability in Trinidad and Tobago. A closed-ended survey questionnaire was subsequently developed and administered to primary construction stakeholders. Secondly, the responses obtained were collated, validated, and ranked using the relative importance index. A confirmatory factor analysis (CFA) was carried out using SPSS, and thereafter, SPSS Amos was used to determine the best-fit Structural Equation Model (SEM). The results strongly indicate that the issue of delayed payments is very prevalent within public sector projects. Unstable political climates and the delay in employers’ issuance of variation orders were found to be the main causes of delayed payments within the industry. Delays in sub-contractor and supplier payments as well as an increase in the contractor’s debt are the leading effects of delayed payments on the contractor’s cash flows. Based on these findings, a risk response framework was outlined to assist small to medium-contracting enterprises cope with payment delays, both locally and internationally. This research contributes to the advancement of construction management knowledge by informing construction professionals and policy makers of the implications of delaying approved payments, the consequential causes and effects, and a risk response technique to mitigate the negative effects on contractors’ cash flows. Doi: 10.28991/CEJ-2023-09-01-05 Full Text: PDF

Publisher

Ital Publication

Subject

Geotechnical Engineering and Engineering Geology,Building and Construction,Civil and Structural Engineering,Environmental Engineering

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3