Modelling the domino effect of advance payment system on project cash flow and organisational performance

Author:

Omopariola Emmanuel Dele,Windapo Abimbola Olukemi,Edwards David JohnORCID,Aigbavboa Clinton Ohis,Yakubu Sunday Ukwe-Nya,Obari Onimisi

Abstract

PurposePrevious studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.Design/methodology/approachThe epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).FindingsEmergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.Practical implicationsThe ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.Originality/valueThere is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference64 articles.

1. Construction delays in Iranian civil engineering projects: an approach to the financial security of construction business;Life Science Journal,2013

2. Abubakar, A. (2004), “Advance payment and performance bond: management and administration”, A Paper Presented at the 2-day Seminar on Contract Administration and Management Organised by the Nigerian Institute of Quantity Surveyors at Lagos Airport Hotel, Ikeja, Lagos, Nigeria, 4-5 April, Nigerian Institute of Quantity Surveyors (NIQS).

3. Assessing critical risk factors (CRFs) to sustainable housing: the perspective of a sub-saharan african country;Journal of Building Engineering,2021

4. Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa,2018

5. Exploring the significant cash flow factors influencing building projects profitability in Ghana;International Journal of Construction Engineering and Management,2018

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3