Project delay has been a phenomenon contending with the construction sector opposing time, cost, and quality. This study develops a model, which is a combination of two mathematical decision-making methods DEMATEL and system dynamics modeling, to investigate the impact of the factors on the entire project schedule. The simulation results reveal the importance of minimizing design error to reduce the project delay at the beginning (or preconstruction stage) of the project. Rework, design changes, and change orders must also be closely monitored during the construction to ensure work productivity and on-time project completion. The results also reveal that experienced designers and the use of updated design technology help reduce design errors, thus enhancing work performance in the long term. As shown in the simulation results, the actual project completion time and magnitude of delay steadily reduce with the project series. This explains the fact that the more the consistency and effectiveness in handling the delay factors as similar projects are performed in turns, the better the project performance in terms of time. Therefore, careful consideration of the delay factors reduces the time lag and delay magnitude in construction projects. Other improvements, such as effective supervision during construction which is a function of experienced supervisors, good project management, and cooperation among key stakeholders, including owners, consultants, and contractors, also assist in reducing the construction delay in the long term.
Funder
Sirindhorn International Institute of Technology, Thammasat University
Subject
Urban Studies,Building and Construction,Geography, Planning and Development
Reference131 articles.
1. Exploring the Causes of Delays in Construction Industry Using a Cause-And-Effect Diagram: Case Study for Iran;Abbasi;J. Architect. Eng.,2020
2. Developing a Causal Relationship Among Factors of E-Commerce: A Decision Making Approach;Abdullah;J. King Saud Uni. Comput. Inf. Sci.,2019
3. Project Management and the Effect of Rework on Construction Works: A Case of Selected Projects in Abuja metropolis, Nigeria;Abeku;Int. J. Finance Manag. Practic.,2016
4. Delay in Construction: A Brief Study of the Florida Construction Industry;Ahmed,2003
5. Construction Delays and Their Causative Factors in Nigeria;Aibinu;J. Constr. Eng. Manage.,2006
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献