1. AIA, & Council, A.C. (2007). Integrated project delivery: A guide. American Institute of Architects, California.
2. Impact of construction delay-controlling parameters on project schedule: DEMATEL-system dynamics modeling approach;Ajayi;Front. Built Environ.,2022
3. The significant factors causing delay of building construction projects in Malaysia;Alaghbari;Eng. Constr. Archit. Manag.,2007
4. Allen, L.N. (2001). Comparison of Design-Build to Design-Bid Build as a Project Delivery Method.
5. CAPT. (2016). CAPT Public Tenders Law No.49 of 2016. The Central Agency for Public Tenders, Kuwait. Re trieved December 2019 from https://capt.gov.kw/en/laws/.