Abstract
Thermal power plants (TPPs) with back-pressure steam turbines (BPSTs) were widely used for electricity and steam production in the Union of Soviet Socialist Republics (USSR) due to their high efficiency. The collapse of the USSR in 1991 led to a decrease in industrial production, as a result of which, steam production in Russia was reduced and BPSTs were left without load. To resume the operation of TPPs with BPSTs, it is necessary to modernize the existing power units. This paper presents the results of the thermodynamic analysis of different methods of modernization of TPPs with BPSTs: the superstructure of the steam low-pressure turbine (LPT) and the superstructure of the power unit operating on low-boiling-point fluid. The influence of ambient temperature on the developed cycles’ efficiency was evaluated. It was found that the usage of low-boiling-point fluid is thermodynamically efficient for an ambient temperature lower than 7 °C. Moreover, recommendations for the choice of reconstruction method were formulated based on technical assessments.
Funder
Ministry of Science and Higher Education of the Russian Federation
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献