Abstract
According to the characteristics of flexible job shop scheduling problems, a dual-resource constrained flexible job shop scheduling problem (DRCFJSP) model with machine and worker constraints is constructed such that the makespan and total delay are minimized. An improved African vulture optimization algorithm (IAVOA) is developed to solve the presented problem. A three-segment representation is proposed to code the problem, including the operation sequence, machine allocation, and worker selection. In addition, the African vulture optimization algorithm (AVOA) is improved in three aspects: First, in order to enhance the quality of the initial population, three types of rules are employed in population initialization. Second, a memory bank is constructed to retain the optimal individuals in each iteration to increase the calculation precision. Finally, a neighborhood search operation is designed for individuals with certain conditions such that the makespan and total delay are further optimized. The simulation results indicate that the qualities of the solutions obtained by the developed approach are superior to those of the existing approaches.
Funder
National Natural Science Foundation of China
China Postdoctoral Science Foundation
Project of Xi'an Science and Technology Program
Subject
Electrical and Electronic Engineering,Biochemistry,Instrumentation,Atomic and Molecular Physics, and Optics,Analytical Chemistry
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献