Funder
National Natural Science Foundation of China
Publisher
Springer Science and Business Media LLC
Reference62 articles.
1. Andrade-Pineda JL, Canca D, Gonzalez PL, Calle M (2020) Scheduling a dual-resource flexible job shop with makespan and due date-related criteria. Ann Oper Res 291:5–35. https://doi.org/10.1007/s10479-019-03196-0
2. Araghi MET, Jolai F, Rabiee M (2014) Incorporating learning effect and deterioration for solving a sdst flexible job-shop scheduling problem with a hybrid meta-heuristic approach. Int J Comput Integr Manuf 27:733–746. https://doi.org/10.1080/0951192x.2013.834465
3. Bautista J, Alfaro R, Batalla C, Cano A (2013) Incorporating the work pace concept into the mmsp-w (first version). In: 7th International Conference on Industrial Engineering and Industrial Management-XVII Congreso de Ingeniería de Organización (CIO 2013) · XIX International Conference on Industrial Engineering and Operations Management (ICIEOM). Province of Valladolid, pp 427–435
4. Berti N, Finco S, Battaia O, Delorme X (2021) Ageing workforce effects in dual-resource constrained job-shop scheduling. Int J Prod Econ 237:108151. https://doi.org/10.1016/j.ijpe.2021.108151
5. Biskup D (1999) Single-machine scheduling with learning considerations. Eur J Oper Res 115:173–178. https://doi.org/10.1016/s0377-2217(98)00246-x