1. Bates, J., Dix, M., May, A.D., 1987. Travel time variability and its effect on time of day choice for the journey to work. In: Transportation Planning Methods, Proceedings of Seminar C of PTRC, pp. 299–311.
2. Black, I.G., Towriss, J.G., 1993. Demand effects of travel time reliability. Center for Logistics and Transportation, Cranfield Institute of Technology.
3. Bogenberger, K., May, A.D., 1999. Advanced coordinated traffic responsive ramp metering strategies. California PATH working Paper, UCB-ITS-PWP-99-19.
4. Cambridge Systematics, 2001. MnDOT ramp metering study – Final report. Assessed on October 5, 2004.
5. Gini, C., 1936. On the measure of concentration with espacial reference to income and wealth. Cowles Commission.