FACTORS CAUSING REWORK AND THEIR IMPACT ON PROJECTS’ PERFORMANCE IN EGYPT

Author:

Al-Janabi Assim Muwafaq1ORCID,Abdel-Monem Mohamed Shawky2,El-Dash Karim Mohamed2

Affiliation:

1. Ministry of Planning, Baghdad, Iraq; Department of Civil Engineering at Shoubra, Benha University, Egypt

2. Department of Civil Engineering at Shoubra, Benha University, Egypt

Abstract

The Egyptian construction industry suffers from severe delays and cost overruns. Rework is a prime cause of this challenge. Therefore, the objective of this study to identify the root causes of rework for Egyptian construction projects and their impact on the project duration and cost. An extensive literature review has been done to identify the most common factors affecting rework. Hence, eighty-seven factors were identified and categorised into ten groups. Structured interview technique was adopted to get the opinions of 67 Egyptian construct professionals for nineteen different construction projects. Total Importance Index of Rework Impact (T.I.I.R.I%) was used to analyse and rank rework factors. Accordingly, the most critical five rework factors are economic situation for the country, schedule compression, design changes, specifications change, and inadequate feasibility study. Based on the survey results, the project stakeholders should consider the critical rework factors during the planning stage and before the project execution, to eliminate or reduce the occurrence and impact of rework causes and to improve the performance of the projects. This paper provides state of the art for rework causes and their effects on construction projects performance, and it can be beneficial for both practitioners and researchers for future work.

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management,Civil and Structural Engineering

Reference75 articles.

1. The cost of non-conformance during a highway project: a case study

2. Projects management and the effect of rework on construction works: A case of selected projects in Abuja Metropolis;Abeku, D. M.;International Journal of Finance and Management in Practice,2016

3. Aiyetan, A. O. (2013). Causes of rework on building construction projects in Nigeria. https://hdl.handle.net/10520/EJC150372

4. Effect of rework on project performance in building project in Nigeria;Ajayi, O.;International Journal of Engineering Research & Technology,2015

5. A project control process in pre‐construction phases

Cited by 24 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3