Unraveling the origins of construction rework: a holistic bibliometric analysis and exploration of causative factors

Author:

Gumusburun Ayalp GuldenORCID,Erdem Eda NurORCID

Abstract

PurposeConstruction experts acknowledge the adverse effects of rework on project performance. However, the limited understanding of its underlying causes remains a significant challenge. Therefore, this study aimed to thoroughly investigate the sources of construction rework.Design/methodology/approachA mixed review using bibliometric analysis as a quantitative method and content analysis as a qualitative method was performed to understand the current knowledge in the field. The Web of Science (WoS) was selected for its comprehensive collection of major research articles and integrated analytical tools for generating representative data. The study involved an extensive bibliometric analysis of 107 journal articles on rework causes from 1991 to 2023. RStudio Bibliometrix, an R statistical programming package, was used to analyze rework origins. This method involved mapping the research landscape, identifying research gaps and analyzing emerging trends.FindingsThe causes of rework can be classified into three main clusters: human- and contractual-based rework causes, design-, quality- and project management-based rework causes and organizational-based rework causes.Originality/valueAlthough several studies have addressed rework causes from various perspectives and methods, the topic has not been investigated holistically. This study is the first to leverage the quantitative and qualitative analytical capabilities of the RStudio Bibliometrix package. Innovative approaches, including the use of metrics, such as the h-index, thematic mapping and trend topic analysis, were employed for a comprehensive understanding of rework causes.

Publisher

Emerald

Reference103 articles.

1. Causes of delay in building construction projects in Egypt;Journal of Construction Engineering and Management,2008

2. Factors causing rework and their impact on projects' performance in Egypt;Journal of Civil Engineering and Management,2020

3. Identification of coordination factors affecting building projects performance;Alexandria Engineering Journal,2016

4. Supply chain emerging aspects and future directions in the age of covid-19: a systematic review;Uncertain Supply Chain Management,2021

5. Alwi, S., Hampson, K. and Sherif, M. (1999), in Marosszeky, M. and Karim, K. (Eds), Investigation into the Relationship between Rework and Site Supervision in High Rise Building Construction in Indonesia, University of New South Wales, Sydney, pp. 189-195.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3