A project control process in pre‐construction phases

Author:

Al‐Reshaid Khaled,Kartam Nabil,Tewari Narendra,Al‐Bader Haya

Abstract

PurposeIt is a well‐known fact that the construction industry always passes through two distinctive problems during the construction stage: slippages of project‐schedules, i.e. time‐frame, and overruns of project‐costs, i.e. budget. However, limited literature is available to solve or dilute these two problems before they even occur. It is strongly believed that the bulk of the two mentioned problems can be mitigated to a great extent, if not eliminated, provided that proper attention is paid to the pre‐construction phases of projects. Normally projects are implemented through traditionally old techniques which generally emphasize only solving “construction problems during the construction phase”. The aim of this article is therefore to unveil a professional methodology known as Project Control System (PCS) focusing on pre‐construction phases of construction projects.Design/methodology/approachIn this article, the authors share the lessons learned during implementation of Kuwait University projects worth approximately $400 million in a span of ten years. The task of the project management/construction management (PM/CM) is being provided to the university by a joint venture team of international and local specialists.FindingsThe pre‐construction methodology ensures smooth and successful implementation during construction phases of the projects as they are generally executed in a fast‐pace, deadline‐driven and cost‐conscious environment. The intuitive proactive methods, if implemented during pre‐construction stage, automatically answer the questions that are encountered during the execution periods of projects.Originality/valueIn this article, the authors share the lessons learned during PM/CM during projects over a span of ten years, which could be of use to others.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference12 articles.

1. Al Rashaid, K. and Kartam, N. (2003), “Effective project management using web‐based technology”, Journal of Science & Engineering, Vol. 30 No. 2, pp. 153‐66.

2. Barrie, D. and Paulson, B. (1992), Professional Construction Management, 3rd ed., McGraw‐Hill Book Co., New York, NY, pp. 354‐60.

3. Bramble, B., D'Onofrio, M. and Stetson, J. (1990), Avoiding and Resolving Construction Claims, RS Means, Kingston, MA, p. 13.

4. Dell'Isola, A. (1997), Value Engineering, Practical Applications for Design, Construction, Maintenance and Operations, RS Means, Kingston, MA.

5. Essex, D. (2003), “Web security”, Magazine of Project Management Institute, August, pp. 24‐6.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3