Exploring Pre-Construction Activities in Infrastructure Projects That Can Benefit from Contractor Involvement

Author:

Memić Nadina1,Tadayon Allen12,Olsson Nils O. E.3ORCID,Wondimu Paulos A.14,Ishtiaque Tausif Ahmed1ORCID,Lædre Ola1ORCID

Affiliation:

1. Department of Civil and Environmental Engineering, Norwegian University of Science and Technology (NTNU), 7491 Trondheim, Norway

2. Department of Built Environment, Oslo Metropolitan University (OsloMet), 0130 Oslo, Norway

3. Department of Mechanical and Industrial Engineering, Norwegian University of Science and Technology (NTNU), 7491 Trondheim, Norway

4. Norwegian Public Roads Administration (NPRA), 0667 Oslo, Norway

Abstract

The pre-construction phase of public infrastructure projects is characterized by significant uncertainty as crucial decisions are made with limited information. This early stage of project development is influenced by a multitude of factors and input from various stakeholders. While early contractor involvement (ECI) offers potential benefits for both clients and projects, the timing and selection of tasks for involving the contractor are critical to achieving these benefits. This study seeks to identify key pre-construction activities in public infrastructure projects and pinpoint the activities that stand to gain the most from ECI. The research methodology involved conducting semi-structured interviews, organizing seven workshops, and conducting the literature and document studies. Through these efforts, the study identified a total of 20 pre-construction activities, among which 5 activities emerged as the most favorable candidates for ECI, while 5 others were deemed less suitable. The findings underscore a consensus that involving contractor expertise during the Brief Development sub-phase holds significant promise. Notably, activities associated with planning, environmental considerations, and technical aspects related to the scope clarification, were found to be highly amenable to ECI. Activities addressing uncertainty management received particular attention, with clients valuing contractors’ practical experience in risk assessment and mitigation. Additionally, contractors’ insights into planning, activity dependencies, and their contributions to health, safety, and environmental plans were highly regarded. However, activities, categorized under the more technical sub-phases of Concept Development and Detailed Engineering yielded mixed results, while those falling within the predominantly social and political domain and involving political processes and societal impact, were viewed as less suitable for early contractor involvement. These findings emphasize the need to adopt a systematic and consistent approach to pre-construction activities, highlighting that ECI should not be applied as a one-size-fits-all solution. The interview results somewhat contrast with the literature findings, which indicate that the early conceptual phase is most beneficial as the contractor impact is highest. To some extent, the client, contractor, and consultant still see their benefit and strategy before the good of the project.

Funder

The Research Council of Norway

Norwegian University of Science and Technology

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3