Theoretical framework of the causes of construction time and cost overruns
Author:
Publisher
IOP Publishing
Subject
General Medicine
Link
http://stacks.iop.org/1757-899X/271/i=1/a=012032/pdf
Reference32 articles.
1. Reasons for Cost and Schedule Increase for Engineering Design Projects
2. Magnitude of Construction Cost and Schedule Overruns in Public Work Projects
3. Mathematical Expressions for Explaining Project Delays in Southwestern Nigeria
Cited by 11 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Assessment of Cost Influences in Rail Projects from Contractor's Perspectives;International Journal of Built Environment and Sustainability;2023-12-27
2. Structural model of cost overrun factors affecting Pakistani construction projects;Mehran University Research Journal of Engineering and Technology;2023-04-03
3. Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia;Journal of Engineering;2022-08-26
4. Multiphase Project Risk Management on Food Factory Building Construction: Consultant Perspective;Journal of Construction in Developing Countries;2022
5. AI and Text-Mining Applications for Analyzing Contractor’s Risk in Invitation to Bid (ITB) and Contracts for Engineering Procurement and Construction (EPC) Projects;Energies;2021-07-30
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3