Magnitude of Construction Cost and Schedule Overruns in Public Work Projects
Author:
Affiliation:
1. Department of Civil & Environmental Engineering & Construction, Howard R. Hughes College of Engineering, University of Nevada, Las Vegas, NV 89154, USA
2. Clark County Public Works Department, Las Vegas, NV 89154, USA
Abstract
Funder
Clark County Public Work Department
Publisher
Hindawi Limited
Subject
Computer Networks and Communications,Hardware and Architecture,Software
Link
http://downloads.hindawi.com/archive/2013/935978.pdf
Reference10 articles.
1. Predictors of Cost‐Overrun Rates
2. Cost overruns in road construction—what are their sizes and determinants?
3. Using Risk Management Techniques to Control Contract Costs
4. Comparison of U.S. Project Delivery Systems
5. Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports
Cited by 44 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Electric utility construction: Causes and types of field change orders;The Electricity Journal;2023-10
2. Association Between Delay, Project Size and Low Bid Percentage;International Journal of Applied Engineering and Management Letters;2023-06-30
3. Suitable delay minimizing measures: Case Analysis of Selected Road and Bridge Projects in Various Geographical Regions of Nepal;SSRN Electronic Journal;2023
4. REVIEW FOR TIMELY COMPLETION OF INFRASTRUCTURE PROJECTS;International Journal of Research -GRANTHAALAYAH;2022-11-30
5. Cost Underruns in Major Road Transport Infrastructure Projects—The Surprising Experience of Poland;Sustainability;2022-11-07
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3