1. AIA Document A201TM-2007, p. 20. General Condition of the Contract for Construction. https://content.aia.org/sites/default/files/2016–09/AIA-A201–2007- Free-Sample-Preview.pdf.
2. Causes and Effects of Change Orders on Construction Projects in Kuwait;Alaryan;Journal of Engineering Research and Applications,2014
3. Alonso and Greenwell (2013). Underground vs. Overhead: Power Line Installation-Cost Comparison and Mitigation 2013. https://www.power-grid.com/td/underground-vs-overhead-power-line-installation-cost-comparison/#gref.
4. Causes of change orders in the jordanian construction industry;Alshdiefat;J. Build. Constr. Plan. Res.,2018
5. Causes of cost overruns in building construction projects in Asian countries; Iran as a case study.;Amini;Eng., Constr. Archit. Manag.,2023