Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia

Author:

Negesa Adamu Beyene1ORCID

Affiliation:

1. Department of Civil Engineering, Jimma Institute of Technology, Jimma University, Jimma, Ethiopia

Abstract

In recent years, the majority of the construction projects executed in Addis Ababa city experienced a varying magnitude of time overrun in which the projects become late in their completion. Due to different problems encountered during the inception, design, and implementation phases, the projects are exposed to unexpected time overruns that in turn affect the overall performance of the projects. It is hence very essential to identify the actual causes of delay in order to minimize or avoid the corresponding adverse impacts. Therefore, this study primarily aimed at investigating and scrutinizing the potential factors causing project time overrun in the city so that the influential factors can be identified and the applicable remedial measures can possibly be forwarded. For the purpose of data collection, the study applied a semistructured questionnaire survey. The questionnaire was distributed to 121 respondents comprising practitioners and professionals actively working in the construction industry. Fifty-four delay-causing factors were identified and grouped under ten categories according to the similarity of their origin. In order to identify the most significant factors, severity analysis based on the principle of relative importance index was carried out. Accordingly, the top most significant and least significant factors were identified. The top four most influential factors identified were reluctance of consultants, inaccurate estimation of contract duration, delay in approvals and late decision making, and slow mobilization of labor whereas inadequacy of allocated funds, low motivation, and absence of incentives to contractors were the three least significant causes identified. So as to curb the adverse impact of the factors, the application of a detailed work breakdown structure, proper responsibility assignment, earned value principle, and project software were proposed as remedial measures to be implemented. The finding of the study will alarm the key players and practitioners engaging in the city’s construction industry to focus on managing the severe factors.

Publisher

Hindawi Limited

Subject

Electrical and Electronic Engineering,Industrial and Manufacturing Engineering,Hardware and Architecture,Mechanical Engineering,General Chemical Engineering,Civil and Structural Engineering

Reference53 articles.

Cited by 15 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3