Author:
Koirala Madhav Prasad,Shahi Roshan Samrat
Reference41 articles.
1. Potential effects on large mara construction projects due to construction delay;Abdullah;International Journal of Integrated Engineering,2009
2. Agergaard, J., Subedi, B., Geography, D.B.-P., & 2022, undefined. (2022). Political geographies of urban demarcation: Learning from Nepal’s state-restructuring process. ElsevierJ Agergaard, BP Subedi, D BrøggerPolitical Geography, 2022•Elsevier. 〈https://www.sciencedirect.com/science/article/pii/S0962629822000191〉.
3. Contributing factors of time overrun in public sector construction projects;Akram Akhund;Engineering, Technology & Applied Science Research,2018
4. Modified Mamdani-fuzzy inference system for predicting the cost overrun of construction projects;Al-Nahhas;Applied Soft Computing,2024
5. A methodology for the development of delay mitigation measures in construction projects;Arantes;Production Planning & Control,2021