Abstract
Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.
Publisher
Engineering, Technology & Applied Science Research
Reference21 articles.
1. D. M. Leishman, “Protecting engineer against construction delay claims NDC”, Journal of Management in Engineering, Vol. 7, No. 3, pp. 314-333, 1991
2. A. U. Elinwa, M. Joshua, “Time-overrun factors in the Nigerian construction industry”, Journal of Construction Engineering and Management, Vol. 127, No. 5, pp. 419-425, 2001
3. M. Abd El-Razek, H. Bassioni, A. Mobarak, “Causes of Delay in Building Construction: Projects in Egypt”, Journal of Construction Engineering And Management, Vol. 134, No. 11, pp. 831-841, 2008
4. R. Hassan, A. M. S. Suliman, A. Y. Malki, “An Investigation into the Delays in Road Projects in Bahrain”, International Journal of Research in Engineering and Science, Vol. 2, No. 2, pp. 38-47, 2014
5. E. G. Sinesilassie, S. Z. S. Tabish, K. N. Jha, “Critical factors affecting schedule performance: A case of Ethiopian public construction projects–engineers’ perspective”, Engineering, Construction and Architectural Management, Vol. 24, No. 5, pp. 757-773, 2017
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献