Causes of Delay in Building Construction Projects in Egypt

Author:

Abd El-Razek M. E.123,Bassioni H. A.123,Mobarak A. M.123

Affiliation:

1. Head of Construction and Building Engineering Dept., College of Engineering and Technology, Arab Academy for Science, Technology and Maritime Transport, Cairo, Egypt.

2. Assistant Professor, Construction and Building Engineering Dept., College of Engineering and Technology, Arab Academy for Science, Technology and Maritime Transport, Alexandria 21532, Egypt (corresponding author).

3. Senior Planning Engineer, DEPA United Group, Cairo, Egypt.

Publisher

American Society of Civil Engineers (ASCE)

Subject

Strategy and Management,Industrial relations,Building and Construction,Civil and Structural Engineering

Reference16 articles.

1. Delay Mitigation in the Malaysian Construction Industry

2. Ahmed A. G. (2003). “Assessment of construction contracting companies performance in Egypt.” Ph.D. thesis Zagazig Univ. Zagazig Egypt.

3. Ahmed S. M. Azhar S. Kappagantula P. and Gollapudi D. (2003). “Delays in construction: A brief study of the Florida construction industry.” ASC Proc. 39th Annual Conf. Clemson Univ. Clemson S.C. 257–266.

4. Alwi S. and Hampson K. (2003). “Identifying the important causes of delays in building construction projects.” Proc. 9th East Asia-Pacific Conf. on Structural Engineering and Construction Bali Indonesia Institut Teknologi Bandung Nusa Dua Bali Indonesia.

5. Amer W. H. (1994). “Analysis and evaluation of delays in construction projects in Egypt.” Master thesis Zagazig Univ. Zagazig Egypt.

Cited by 261 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Automated Management of Time Extension Claims;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2024-05

2. Assessment of Critical Project Success Factors for Management of Pavement Construction Using the Delphi Approach;Journal of Construction Engineering and Management;2024-04

3. The Evolution of Forensic Delay Analysis: A Literature Review Investigating Changes and Progress in Project Management Approaches to Delay Measurement;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2024-02

4. Development of a Taxonomy for Causes of Changes in Construction Projects;Buildings;2024-01-19

5. Risk of Delay in Construction Projects;Civil Engineering;2024-01-10

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3