Introducing a fuzzy MCDM model for financial management in multiple project environments

Author:

Afshar Mohammad Reza,Asadzadeh Zenozi Hamed

Abstract

Purpose Statistics in the construction industry show that lack of timely injection of funds to projects by clients is one of the common problems confronted by contractors. This problem is intensified when contractors construct multiple projects simultaneously. In these situations, it is rational that contractors share their financial resources among projects according to project conditions and the firm’s vision. This study aims to propose a fuzzy multi-criteria decision making (MCDM) model for financial management in multiple project environments. Design/methodology/approach First, the project evaluation criteria are defined using exploratory study and interviews with experts. Second, the weights of criteria are determined based on company strategies. Then, each of the projects are evaluated in each criterion. Finally, the fuzzy weighted average approach is used to determine the proportion of each project from the financial resources. Findings The proposed model is prepared as an applicable model for general contractors to assign financial recourses among the multiple projects optimally. Originality/value As a lack of applicable model assigning the financial resources among the multiple projects, this study is one of the first research studies that proposed a fuzzy MCDM model to assign financial resources to multiple projects optimally.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Reference33 articles.

1. Review of finance and investment in disaster resilience in the built environment;International Journal of Strategic Property Management,2016

2. Optimal sub-contractor selection and allocation in a multiple construction project: Project portfolio planning in practice;Journal of the Operational Research Society,2020

3. An interval type-2 fuzzy MCDM model for work package subcontractor prequalification;Soft Computing,2020

4. A mixed integer programming method for multi-project resource leveling;Journal of Construction Engineering, Management and Innovation,2020

5. Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem;Information Sciences,2016

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3