Multi-criteria decision-making model for EPC contractor prequalification: a hybrid approach

Author:

Amiri OmidORCID,Rahimi MahmoudORCID,Ayazi AmirORCID,Khazaeni GarshasbORCID

Abstract

PurposeNowadays, engineering, procurement and construction (EPC) contracts are being widely used to perform industrial and infrastructure projects because of several reasons like high speed of implementation. However, these contracts are always accompanied by high risks and uncertainties. Thus, selection of the right EPC contractor has significant importance. This paper aims to present a fuzzy multi-criteria decision-making (MCDM) model for EPC contractor prequalification.Design/methodology/approachFirst, the EPC contractor prequalification criteria are defined by using literature review and interviewing experts. Second, the weights of criteria are determined by interviewing experts. Then, each EPC contractor is evaluated in each criterion. Finally, fuzzy weighted average (FWA) approach is employed to select the right contractor among potential EPC contractors.FindingsThe proposed model is prepared as an applicable model for clients to select the right EPC contractors among contractors who want to conduct the project.Originality/valueAs a lack of applicable model does exist to assign the prequalification of EPC contractors, this study is one of the first research studies which proposed a fuzzy MCDM model for evaluation of EPC contractors. To cope with the uncertainty of the prequalification problem, fuzzy logic has been used. Using fuzzy sets leads to reaching more reliable results. Also, a real case study is provided to explain the proposed model.

Publisher

Emerald

Subject

Building and Construction,Civil and Structural Engineering

Reference33 articles.

1. A fuzzy-analytic hierarchy process approach for measuring flood resilience at the individual property level;International Journal of Building Pathology and Adaptation,2020

2. Introducing a fuzzy MCDM model for financial management in multiple project environments;Construction Innovation,2021

3. A type-2 fuzzy set model for contractor prequalification;Automation in Construction,2017

4. An interval type-2 fuzzy MCDM model for work package subcontractor prequalification;Soft Computing,2021

5. Assessment of causative factors for project abandonment in Nigerian public tertiary educational institutions;International Journal of Building Pathology and Adaptation,2017

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Reinvigorating the process of contractor selection in adaptive reuse projects: a novel decision-making and evaluation paradigm;International Journal of Construction Management;2024-01-23

2. Decision-Making Model for Evaluating Joint Venture Contractors in Construction of Complex Infrastructure Megaprojects;Journal of Construction Engineering and Management;2023-09

3. Ranked generic criteria for EPC contractor selection;Engineering, Construction and Architectural Management;2022-08-04

4. Performance Management in Czech Construction;Tehnički glasnik;2022-02-04

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3