Risks of water and wastewater PPP projects: an investors’ perspective

Author:

Amiri Omid,Ayazi Amir,Rahimi Mahmoud,Khazaeni Garshasb

Abstract

Purpose Water and wastewater (WW) projects are gaining attention in Iran because of shortages of water resources. However, these projects are lengthy and they are accompanied by numerous risks, such as lack of sufficient financial resources. Public–private partnerships (PPPs) are taken into account as a constructive approach to deal with the problem of insufficient government funds and they are increasingly being implemented to construct the required infrastructures in different countries. Although WW projects in PPPs can reduce the government’s debt, investors are still uncertain about this approach. Hence, this study aims to identify and evaluate the risk of all parties involved in WW-PPP projects, from the viewpoint of investor. Design/methodology/approach First, the risk factors which are involved in WW projects are identified by interviewing experts and reviewing the literature by means of fault tree analysis (FTA) tool. Second, the probability and effects of the risky factors which are related to specific event are evaluated and analyzed by hybridization of interval fuzzy Type-2 sets (IT2FS) and risk score formulation. Finally, some solutions are proposed to deal with the most challenging risks. Findings Six gate events, namely, risks which are related to investors such as investor’s consultant-related risks, risky conditions from engineering, procurement, and construction (EPC) contractors’ point of view, risk factors which public sector takes into account, public sector’s consultant-related risks which public sector’s consultant consider challenging and external factors were defined according to the literature. From FTA tool and by interviewing the experts, 94 basic events were identified. Finally, from hybridization of IT2FSs and risk score formulation, top five risks are determined as “Difficulty of injecting financial resources into the project,” “Fluctuation in inflation rate,” “Poor decision-making process” in public sector, “Difficulty of importing the equipment which are required for the project (such as pumps, grain catchers, garbage collectors, etc.) from other countries” and “Impact of risky conditions in other projects on operation of PPP project.” Originality/value In the absence of a constructive approach for risk identification and a reliable model for evaluating the identified risks in PPP projects, this research project is one of the first research studies which used FTA for identifying risks and hybridization of IT2FSs and risk score formulation for evaluating the risks.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Reference25 articles.

1. Introducing a fuzzy MCDM model for financial management in multiple project environments;Construction Innovation,2021

2. An interval type-2 fuzzy MCDM model for work package subcontractor prequalification;Soft Computing,2020

3. A type-2 fuzzy set model for contractor prequalification;Automation in Construction,2017

4. Delay in public utility projects in Saudi Arabia;International Journal of Project Management,1999

5. A fuzzy approach for the allocation of risks in public–private partnership water-infrastructure projects in developing countries;Journal of Infrastructure Systems,2016

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3