Analysis of Factors Affecting Cost and Time Overruns in Construction Projects
Author:
Publisher
Springer Singapore
Link
https://link.springer.com/content/pdf/10.1007/978-981-33-6969-6_6
Reference18 articles.
1. Le-Hoai L, Dai Lee Y, Lee JY (2008) Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries. KSCE J Civ Eng 12(6):367–77. https://doi.org/10.1007/s12205-008-0367-7
2. Olawale YA, Sun M (2010) Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Constr Manage Econ 28(5):509–26. https://doi.org/10.1080/01446191003674519
3. Larsen JK, Shen GQ, Lindhard SM, Brunoe TD (2016) Factors affecting schedule delay, cost overrun, and quality level in public construction projects. J Manage Eng 32(1):04015032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391
4. Flyvbjerg B, Holm MS, Buhl S (2002) Underestimating costs in public works projects: error or lie? J Am Plann Assoc 68(3):279–95. https://doi.org/10.1080/01944360208976273
5. Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. Int J Project Manage 24(4):349–57. https://doi.org/10.1016/j.ijproman.2005.11.010
Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Sport seasons through the lenses of project management – Identifying the common key characteristics of sport seasons and projects;Vezetéstudomány / Budapest Management Review;2024-07-10
2. Evaluation and prediction of time overruns in Jordanian construction projects using coral reefs optimization and deep learning methods;Asian Journal of Civil Engineering;2024-01-09
3. Predicting the construction projects time and cost overruns using K-nearest neighbor and artificial neural network: a case study from Jordan;Asian Journal of Civil Engineering;2023-04-13
4. Methodology for selection of rational organizational and technological solutions at the stages of pre-design and design preparation of construction object;PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ENGINEERING RESEARCH AND APPLICATION 2022 (ICERA 2022);2023
5. Minimization of Risks in Highway Projects Using Buffer;Lecture Notes in Civil Engineering;2021-12-15
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3