1. Elawi, G. S. A., Algahtany, M., & Kashiwagi, D. (2016). Owners perspective of factors contributing to project delay: Case studies of road and bridge projects in Saudi Arabia. Procedia Engineering, 145, 1402–1409.
2. Sharma, S., & Gupta, A. K. (2021). Analysis of factors affecting cost and time overruns in construction projects. In: S. Kumar Shukla, S. N. Raman, B. Bhattacharjee, & J. Bhattacharjee (Eds.), Advances in geotechnics and structural engineering. Lecture notes in civil engineering, Vol. 143. Springer, Singapore. https://doi.org/10.1007/978-981-33-6969-6_6
3. Farag, M. A. M. (2010). An integration of a buffering assessment model using fuzzy logic with lean management for improving highway construction process.
4. Ghaziani, A. (2012). A fuzzy delay assessment tool for construction projects (Doctoral dissertation, M.S. Thesis, Civil Engineering, Middle East Technical University, Ankara).
5. Park, M., & Pena Mora, F. (2004). Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130, 626–637.