1. Ballard G. (
2000). “Phase scheduling.” LCI White Paper 7 Lean Construction Institute 〈www.leanconstruction.org〉 (Sep. 2003).
2. Ballard G. and Howell G. (
1995). Proc. 1995 ARCOM Conf. Association of Researchers in Construction Management Sheffield England.
3. Ballard G. and Tommelein I. (
1999). “Aiming for continuous flow.” LCI White Paper 3 〈www.leanconstruction.org〉 (Sep. 2003).
4. Chua D. and Shen L. (
2001). “Constraint modeling and buffer management with integrated production scheduler.” Proc. 9th Int. Group for Lean Construction Conf. Singapore.
5. Eppinger S. and Krishnan V. (
1992). “Overlapping product development activities by analysis of information transfer practice.” Working Paper 3478-92 Sloan School of Management MIT Cambridge Mass.