Cost and time control of construction projects: inhibiting factors and mitigating measures in practice
Author:
Publisher
Informa UK Limited
Subject
Industrial and Manufacturing Engineering,Building and Construction,Management Information Systems
Link
http://www.tandfonline.com/doi/pdf/10.1080/01446191003674519
Reference43 articles.
1. The effects of construction delays on project delivery in Nigerian construction industry
2. Identification and evaluation of factors influencing variations on building projects
3. Construction delay: a quantitative analysis
4. Cost overruns in public projects
5. Causes of delay in large construction projects
Cited by 261 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Cost and time risk factors in construction projects in the Dominican Republic;Frontiers in Built Environment;2024-07-16
2. The advance integration and visualization of construction 4.0: automation, robotics, and BIM;Asian Journal of Civil Engineering;2024-06-21
3. Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of the City of Kampala;Buildings;2024-06-15
4. Integrated 4D Design Change Management Model for Construction Projects;Journal of Construction Engineering and Management;2024-05
5. Construction Price Index Prediction through ARMA with Inflation Effect: Case of Thailand Construction Industry;Buildings;2024-04-27
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3