Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of the City of Kampala

Author:

Tukundane Hillary1,Yang Yu1

Affiliation:

1. College of Civil Engineering, Liaoning Technical University, Fuxin 123000, China

Abstract

This research paper analytically evaluates the project control practice levels used by the building construction companies within Kampala, Uganda. The research also assesses the impact of project control practices on the productivity of companies. The research was performed to ascertain the current control practices among 160 respondents from various construction companies registered with the Uganda Registration Services Bureau. This research used amalgamation from multiple studies in the literature to obtain the variables. This research adopts 34 standard control practices from 4 vital project control duties: planning, monitoring, analyzing, and reporting. These project control tasks were organized using mean response ratings grounded in their relevance to the construction companies. This process authorized researchers to prioritize tasks based on their perceived importance or relevance to the construction companies involved. Results showed that evaluating performance with the use of S-curves (4.32), timely access to information and encouragement (4.55), report representation using quantitative tools 4.75, and cost value comparison application during analysis (4.76) were rated least among the control practices. On the other hand, the top project control practices included formulation of the project schedule (8.88), project feasibility validation (8.86), budgeting for each activity (8.84), key project route definition (8.81), team awareness of the budget (8.77), setting realistic targets for projects (8.50), and consultation from subcontractors (8.74). From the results obtained by the sample respondents specified, it can be concluded that planning is the most vital project control task practiced in the building construction industry in Uganda. In addition, this research ascertained a substantial relationship between project control practices and the performance of building construction companies. Accordingly, this research recommends that project control practices be effectively observed by both contracting and consulting companies to enhance their overall performance and governance.

Publisher

MDPI AG

Reference56 articles.

1. Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice;Olawale;Constr. Manag. Econ.,2010

2. The influence of monitoring and control on project management success;Gimena;Int. J. Constr. Output Manag.,2014

3. Kerzner, H. (2018). Project management best practices. Achieving Global Excellence, John Wiley & Sons.

4. Orumie Ukamaka, C. (2020). Implementation of Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM): A Comparative Study. Int. J. Ind. Oper. Res., 3.

5. Llach i Porcell, G. (2021). Optimization of the PERT/CPM Project Management Methodology by Implementing the Lean and Agile Philosophies. [Master’s Thesis, Universtat de Barcelona].

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3