Author:
Arabiat Ahmad,Al-Bdour Hamza,Bisharah Majdi
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference50 articles.
1. Abdul-Rahman, H., Berawi, M. A., Berawi, A. R., Mohamed, O., Othman, M., & Yahya, I. A. (2006). Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), 125–133.
2. Ahiaga-Dagbui, D. D., & Smith, S. D. (2014). Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7–8), 682–694.
3. Akoa, B. B. (2011). Cost overruns and time delays in highway and bridge projects in developing countries: Experiences from Cameroon. Michigan State University.
4. Al-Kodmany, K. (2018). The sustainability of tall building developments: A conceptual framework. Buildings, 8(1), 7.
5. AlSehaimi, A., Koskela, L., & Tzortzopoulos, P. (2013). Need for alternative research approaches in construction management: Case of delay studies. Journal of Management in Engineering, 29(4), 407–413.
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献