Author:
Budayan Cenk,Dikmen Irem,Talat Birgonul M.,Ghaziani Aydın
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference38 articles.
1. Al-Humaidi, H. M. and Hadipriono Tan, F. (2010). “A fuzzy logic approach to model delays in construction projects using rotational fuzzy fault tree models.” Civil Engineering and Environmental Systems, Vol. 27, No. 4, pp. 329–351, DOI: 10.1080/10286600903150721.
2. Alvarado-Zabala, L. V., Ponz-Tienda, J. L., and Salcedo-Bernal, A. (2016). The problem of computing the latest times of the activities in fuzzy scheduling; A literature review, In Proceedings of the VII Elagec, 16 - 17 November 2016.
3. Arditi, D. and Pattanakitchamroon, T. (2008). “Analysis methods in time-based claims.” Journal of Construction Engineering and Management, Vol. 134, No. 4, pp. 242–252, DOI: 10.1061/(ASCE) 0733-9364(2008)134:4(242).
4. Assaf, S. A. and Al-Hejji, S. (2006). “Causes of delay in large construction projects.” International Journal of Project Management, Vol. 24, No. 4, pp. 349–357, DOI: 10.1016/j.ijproman.2005.11.010.
5. Ayyub, B. M. and Haldar, A. (1984). “Project scheduling using fuzzy set concepts.” Journal of Construction Engineering and Management, Vol. 110, No. 2, pp. 189–204, DOI: 10.1061/(ASCE)0733-9364(1984)110:2(189).
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献