Construction projects are complexity, multidisciplinary, have thousands of activities and details, and involve many participants. This intricate and fragmented nature of construction projects coupled with tight budgets and limited resources makes them good candidates for failure and promotes the emergence of risks. These risks must be addressed in the decision-making process and properly managed to mitigate their effect. However, risk management is one of the most difficult tasks and the assessment and analysis of the cost and schedule risks of construction activities are considered the most challenging tasks in the whole risk management process and require careful considerations throughout the life cycle of a project. Despite the high cost associated with managing risk in construction projects, the outcome of this task normally provides fruitful benefits. To address this crucial issue, this study employs a mixed methodology approach utilizing both qualitative and quantitative methods to gather feedback from construction experts and identify schedule and cost risk events associated with construction activities, prioritize their likelihood of occurrence, and suggest responses to mitigate them. The Program Evaluation and Review Technique (PERT) and earned value (EV) analysis are then used to estimate the expected cost at completion and the risk associated with it. A spreadsheet framework is then developed to help construction practitioners identify the most severe risks and measure their effect on the project’s duration and cost. The framework also suggests risk responses for each of the risk events. The study then provides recommendations to mitigate risks with high impact and severity.
Reference55 articles.
1. Risk assessment and risk management: Review of recent advances on their foundation;Aven;Eur. J. Oper. Res.,2016
2. Abu Qalbin, R., Rabayah, H., Darwish, M., and Abendeh, R. (2023). Assessment of construction risks in projects funded by external sources in Jordan during the COVID-19 pandemic. Buildings, 13.
3. Nasrun, M., Nawi, M., Baluch, N., and Bahauddin, A. (2014, January 27). Impact of Fragmentation Issue in Construction Industry: An Overview. Proceedings of the Building Surveying, Facilities Management and Engineering Conference (BSFMEC 2014), Perak, Malaysia.
4. Prebanić, K.R., and Vukomanović, M. (2023). Exploring Stakeholder Engagement Process as the Success Factor for Infrastructure Projects. Buildings, 13.
5. When ‘less is more’: The rationale for an adaptive toolbox to manage the risk and uncertainty of rework;Love;Dev. Built Environ.,2022