Affiliation:
1. School of Geoscience and Technology, Southwest Petroleum University, Sichuan, Chengdu, China
2. China Construction Underground Space Co., Ltd., Chengdu, Sichuan, China
Abstract
During the construction and assembling stages of shield tunnels, the ellipticity of segment assembly, and the angle between segments are the main reasons for joint leakage of shield tunnel. In this paper, taking Chengdu Metro shield tunnel as the research background, the relationship between assembling ellipticity and segment opening angle is obtained by geometric calculation, and the waterproof effect of gasket under different segment joint angle is studied by finite element analysis method. Results of the nonlinear numerical analyses, there is a linear positive relationship between the opening angle of segments and the ellipticity degree. Meanwhile, the different side joint opening angles of the segments have different effects on the waterproof effect of the gasket, which is manifested as the external angle is greater than the internal. Based on the above research results, this article can provide some references for the design, production, processing, and quality inspection of shield tunnel gasket in the future.
Funder
the Basic Applied Research Projects of Sichuan Science and Technology Department
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献