Author:
Zhang Qian,Xie Li,Zhao Zhirong,Zhao WeiGang,Ma Yan,Shi Longhe,Zhang Zihang
Abstract
AbstractIn the construction stage, due to construction errors and longitudinal differential settlement during tunnel operation, the amount of dislocation and opening at the segment joint increases, increasing the likelihood of water leakage. Therefore, it is necessary to conduct an in-depth study on the influence of the amount of dislocation and opening at the segment joints on the contact stress of the longitudinal section. Firstly, through theoretical analysis, this paper deduces that the waterproof performance of the gasket depends not only on its own contact area, linear compression stiffness, and Poisson’s ratio but also on the height of the segment joint specimen and the amount of joint opening caused by the sinking offset angle. Then, the effects of different openings and dislocations at the segment joints on the contact stress of the segment gasket section were compared using numerical simulation and model experiments. Through numerical simulation, it is found that the dislocation has a greater influence on the longitudinal left section. The average contact stress at 16 mm is 28.3% lower than that at 4 mm, and the influence of the opening amount on the sealing gasket section is greater than that of the dislocation. Combined with the test results, it is also shown that the influence of the opening amount of the waterproof performance at the segment joint is greater than that of the dislocation, and the waterproof rate of the segment gasket section joint is greater than 40% under the modified working condition.
Funder
National Natural Science Foundation of China——Joint Fund for High-speed Railway
The Natural Science Foundation of Hebei Province
The technology development project of Shuohuang Railway Development Co., Ltd.
Publisher
Springer Science and Business Media LLC
Reference23 articles.
1. Liu, Y. X., Shi, J. Y., Xu, J. & Liu, D. S. Numerical simulation of shield tunnel construction. Geotech. Eng. 2, 239–243 (2004).
2. He, C., Feng, K. & Fang, Y. Technical status and prospect of subway tunnel construction by shield method. J. Southwest Jiaotong Univ. 1, 97–109 (2015).
3. Zhu, Z. L., Sun, J. & Zhang, Q. H. Research on intelligent fuzzy control method for shield tunnel construction deformation. Geotech. Mech. 6, 896–900. https://doi.org/10.16285/j.rsm.2005.06.015 (2005).
4. Wang, S. M. & Xie, H. M. Research status and prospect of waterproofing of segment joints in high water pressure shield tunnels. Disaster Prev. Control. Tunn. Undergr. Eng. 2020(2), 66–75 (2020).
5. Gong, C.J.; Ding, W.Q.; Lei, M.F.; Xie, D.W.; Shi, C.H. Study on the characteristics and treatment of water leakage diseases in operating cross-river shield tunnels. Mod. Tunn. Technol. S1, 247–254. DOI:https://doi.org/10.13807/j.cnki.mtt.2020.S1.031 (2020)