Author:
Mirzakhanova Aida,Khalil Muhammad,Galaeva Natalya,Kazaryan Ruben
Abstract
Features of renovation of built-up areas are considered. The main difficulties in carrying out the renovation process are identified. The concept of the constraint factor of the building is defined. Methods. A method for analyzing and assessing constraints for selecting optimal organizational and technical solutions for the renovation of territories is proposed. Results. An analysis algorithm is proposed, based on the consideration of the constraint factor as an array of actions of individual “objects of influence” on the corresponding “subjects of influence”. Conclusion. Сonducting such an analysis will provide the most effective and optimal organizational and technological solutions reflected in the relevant sections of the renovation project in high-rise construction (development of a construction master plan, preparation of calendar and network work schedules). The implemented rational version of the design solution ensured the reduction of the prime cost and the reduction of the terms of the preparatory works for the renovation of housing construction projects taking into account seismic uncertainty. Renovation is one of the varieties of this reconstruction of high rise construction.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献