The short line match-cast method of precast segments has proved to be the most versatile and reliable way to concrete bridge construction. The success of match-cast method relies heavily on accurate geometry control in precasting as the scale of adjustments during erection is very small and difficult to implement. So the required levels of accuracy in segments match-casting are stringent in order to assure erection accuracy. Therefore, the research on segments match-casting and geometry control technique of space distorted segments are very important.Based on the principle of match-casting using the short-line method, the geometry control technology of transition curve section in cross-sea bridge erected by precasting segment girder is proposed. As an example of south approach spans in north branch of Xia-zhang Cross-sea Bridge, this paper will provide a reference for the construction of similar bridges.
Publisher
Trans Tech Publications, Ltd.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献