Short-line prestressed assembly bridge construction method has been widespread used for more than 10 years in China, unlike the “wysiwyg” cast-in-place beam, prefabrication and assembling construction process control is more important, especially for the virtual segment assembly. Due to the short line method commonly used in the large-scale bridge project, it is necessary to research intensive construction control, and improve the level of short line method. This article studied in two ways: the precast assembling error processing and precision control based on parametric analysis of the structure deformation.
Reference5 articles.
1. Geometry Control Technology of Transition Curve Section in Cross-sea Bridge Erected by Precasting Segment Girder;Huang
2. Short line matching method of precast box girder section construction technology [J];Yadong Liu;Journal of chongqing university of architecture,2006
3. Precast segmental assembling continuous girder bridge design and construction key technology [J];liu;Railway construction technology,2006