Affiliation:
1. Ministry of Communication
Abstract
In the approach spans of Quanzhou Bay Cross-sea Bridge, these standard spans are 50m or 70m , width is 20.05m.The approach spans have been built by using short Line segments precast and erection method. This is the first application in the cross sea bridges. According to characteristics of this project, the research on prefabrication and erection technology of wide box girders has been carried out to solve the technical problems in the process of construction. The research show that: 1)In precasting process , the vertical deformation of wide box girder is very small under dead load and temperature load etc. so the influence of prefabrication and erection accuracy can be ignored; 2)The temporary anchor using prestressed steel strand better than planished steel; 3) When using epoxy gasket to adjust geometric line shape, the thickness of cemented layer has a great influence on the linear adjustment;4)The epoxy gasket and bridge erecting machine should be used together, Alignment adjustmen could obtain satisfactory results.
Publisher
Trans Tech Publications, Ltd.