Construction delays causing risks on time and cost - a critical review

Author:

Ramanathan Chidambaram,Narayanan S P,Idrus Arazi B

Abstract

There is an increase in the number of construction projects experiencing extensive delays leading to exceeding initial time and cost budget.  This paper reviews 41 studies around the world which surveyed the delay factors and classified them into Groups.  The main purpose of this paper is to review literature, each of which have categorized the causes that are responsible for time delays and cost overrun in projects. The collected list has 113 causes for delays categorized in to 18 different groups.  Most of the researches have analysed the responses from the Questionnaire survey.    The collected data are used to rank the problem.  The data are further used to investigate and analyse Important Index, Frequency Index, Severity Index, Relative Important Index, Relative Importance Weight, Weighted Average, Mean, Standard Deviation and Variance.  The collective comparison has revealed that the ranking given by all the researchers is not the same.  Further each and every study has different rank ratings for the different group of the delays.  This review paper attempts to provide an updated compilation of the earlier studies on ranking of the delay causers, which are never similar and constant for universal projects.  It is concluded that a separate study is required for identifying the factors causing delay for projects operated in Sabah, East Malaysia.

Publisher

University of Technology, Sydney (UTS)

Subject

General Business, Management and Accounting

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3