Lean Construction: A Sustainability Operation for Government Projects

Author:

Bigwanto Arviga1,Widayati Naniek2,Wibowo Mochamad Agung3,Sari Endah Murtiana4

Affiliation:

1. Civil Engineering Doctoral Program, Faculty of Engineering, Universitas Tarumanagara, Jakarta Barat 11440, Indonesia

2. Faculty of Engineering, Universitas Tarumanagara, Jakarta Barat 11440, Indonesia

3. Department of Civil Engineering, Faculty of Engineering, Diponegoro University, Kota Semarang 50275, Indonesia

4. Department of Information System, Institut Manajemen Wiyata Indonesia, Sukabumi 43113, Indonesia

Abstract

The current state budget allocated for Indonesian government projects has exceeded 10% for infrastructure development. This large budget indicates a need for the construction industry to implement more professional management practices for better cost, time, quality, safety, and environmental impact. Lean construction is used to increase productivity and reduce waste in a project. Therefore, this study aimed to extend lean construction principles to the planning and execution phases of DB projects, where these two entities are integrated into the main contractor. Quantitative and qualitative study methods were used to analyze secondary data from six DB project sites and conduct focus group discussions (FGDs) with expert panels using the Delphi method for consensus. The results showed the factors and variables that influence the implementation of lean construction in government projects in Indonesia.

Funder

PT. Brantas Abipraya

Publisher

MDPI AG

Reference102 articles.

1. Shridhar, D.S. (2024, February 11). Delays in Construction Project and Their Preventions. Available online: http://www.mospi.nic.in.

2. Abdelhamid, T.S., El-Gafy, M., and Salem, O. (2024, February 11). Lean Construction: Fundamentals and Principles. Available online: https://www.researchgate.net/publication/289380759.

3. Causes of High Costs of Construction in Nigeria;Okpala;J. Constr. Eng. Manag.,1988

4. Odeh, A.M., and Battaineh, H.T. (2024, February 11). Causes of Construction Delay: Traditional Contracts. Available online: www.elsevier.com/locate/ijproman.

5. Application of importance-satisfaction analysis and influence-relations map to evaluate design delay factors;Wang;J. Civ. Eng. Manag.,2014

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3