1. Critical causes of time overrun in Indian construction projects and mitigation measures
2. Leveraging on Work Integrated Learning to Enhance Sustainable Design Practices in the Construction Industry
3. International LaboutOrganisation. Sectoral Activities Programme, International Labour office, Geneva 225 (2005).
4. González, P., González, V., Molenaar, M. and Orozo, F., Journal of Construction Engineering and Management, 140(1), 1–9 (2013).
5. Prasad, K. V. and Vasugi, V., Malaysian Construction Research Journal, 23(3), 89–113 (2017).