Readiness Factors for Sustainable Lean Transformation of Construction Organizations

Author:

Prasad Kudrekodlu V.12ORCID,Vasugi Venkatesan1

Affiliation:

1. School of Civil Engineering, Vellore Institute of Technology, Chennai 600127, India

2. National Institute of Construction Management and Research (NICMAR), Hyderabad 500101, India

Abstract

Despite significant research and development on lean construction over the last two decades, cases of sustained lean transformation are few. Readiness for lean transformation is considered an essential requirement. Several studies have been conducted to identify lean readiness factors and develop assessment frameworks in other sectors such as manufacturing, healthcare, pharmaceutical, emergency, higher education, etc., but none in construction. The main objective of this study is to identify the lean readiness factors for the successful lean transformation of construction organizations. Mixed methods of research have been adopted. Factors initially identified from the literature in other sectors and lean construction were further validated by a large team of lean experts. Seventy-three factors were identified, and a questionnaire survey was conducted to identify the critical lean readiness factors for construction organizations. One hundred and two responses were collected from expert lean practitioners and academicians from all over the world. The factors were ranked based on the Importance Index (II). Reliability analysis and ANOVA tests have been conducted. Support from top management, the process of understanding customer requirements, emphasis on team-working, critical data analysis, and constraint removal were found to be the top-ranked lean readiness factors. The study opens up new research directions in lean readiness evaluation and ensures sustained lean transformation of construction organizations.

Funder

Vellore Institute of Technology, Chennai, India

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference82 articles.

1. Critical causes of time overrun in Indian construction projects and mitigation measures;Prasad;Int. J. Constr. Educ. Res.,2019

2. International Labour Organization (2021). ILO Sectoral Brief, International Labour Organization.

3. Organisation for Economic Co-operation and Development (2016). OECD Insights, OECD.

4. Analysis of causes of delay in Indian construction projects and mitigation measures;Prasad;J. Financ. Manag. Prop. Constr.,2019

5. Identification and classification of change causes and effects in construction projects;Padala;Int. J. Constr. Manag.,2020

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3