Affiliation:
1. University of Baghdad , Civil Engineering Department, Construction Project Management , Baghdad , Iraq .
2. Middle Technical University , Baquba Technical Institute , Baghdad , Iraq .
Abstract
Abstract
Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essentially based on the repetitive construction projects’ composition of identical production units. This study develops a mathematical model to forecast repetitive construction projects using the Support Vector Machine (SVM) technique. The software (WEKA 3.9.1©2016) has been used in the process of developing the mathematical model. The number of factors affecting the planning and scheduling of the repetitive projects has been identified through a questionnaire that analyzed its results using SPSS V22 software. Three accuracy measurements, correlation coefficient (R), Root Mean Square Error (RMSE) and Mean Absolute Error (MAE), were used to check the mathematical model and to compare the actual values with predicted values. The results showed that the SVM technique was more precise than those calculated by the conventional methods and was found the best generalization with R 97 %, MAE 3.6 %, and RMSE 7 %.
Reference21 articles.
1. [1] AKOGBE, R. - FENG, X. - ZHOU, J.: Importance and ranking evaluation of delay factors for development construction projects in Benin. KSCE Journal of Civil Engineering, Springer, Vol. 17, 2013, pp. 1213–1222.10.1007/s12205-013-0446-2
2. [2] ABBASNEJAD, B. - IZADI MOUD, H.: Construction delays in Iranian civil engineering projects: An approach to the financial security of construction business. Life Science Journal, Vol. 10, Iss. 2, 2013, pp. 2632–2637.
3. [3] AL GERGAWI, Z.: Grammar teaching methodology for the questionnaire. Second Edition, publisher of Al Quds Open University, a press of the surgeon, Jerjao, 2010.
4. [4] ALAGHBARI, W. - KADIR, M. - SALIM, A. - ERNAWATI: The significant factors are causing a delay in building construction projects in Malaysia. Engineering, Construction and Architectural Management, Vol. 14, Iss. 2, 2007, pp. 192–206.10.1108/09699980710731308
5. [5] JÁSKOWSKI, P. - BIRUK, S.: Minimizing the Duration of Repetitive Construction Processes with Work Continuity Constraints. Computation Journal, Vol.7, Iss. 14, 2019, pp. 1–11.10.3390/computation7010014
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献