Serial tendering is better than other types of tendering when it comes to cost reduction, where civil infrastructure projects need a significant increase in the amount of tough planning, financial expenditures, engineering work, and resources of a different character than other types of construction projects. The effects of a lack of funding cause decrease in the completion speed of the project on time. The need to reduce the cost of bidding on recurrent civil infrastructure projects is critical. To achieve the desired goals of this research, this article will provide an overview of the type of bids used in the construction of schools implemented in the current financial perspective in Iraq, the extent of benefit, and the amount of possible reduction if continuous and serial tendering are used.
Subject
Mechanics of Materials,Materials Science (miscellaneous)
Reference10 articles.
1. RICS. RICS guidance, UK: Tendering strategies; 2014.
2. Burhan AM, Erzaij KR, Hatem WA. Developing a mathematical model for planning repetitive construction projects by using support vector machine technique. Civ Environ Eng. 2021;17:371–9.
3. Altaie M, Borhan AM. Using neural network model to estimate the optimum time for repetitive construction projects in Iraq. Assoc Arab Univ J Eng Sci. 2018;25(5):100–14.
4. Zelalem G. Investigation of least cost contract practice in public building construction projects, the case of Bahir Dar City [dissertation]. Bahir Dar: Bahir Dar University; 2020.
5. Hikmat N, Ibrahim A, Azhar H. Building a mathematical model to increase contractors’ chances of winning bids for the construction sector in Iraq; 2016.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献