Affiliation:
1. Universidade Estadual de Campinas, Brasil
2. Instituto Federal de Educação, Ciência e Tecnologia do Tocantins, Brasil
3. Universidade de Brasília, Brasil
Abstract
Abstract Delay is one of the most recurrent problems in the construction industry. It is the cause of major negative consequences on construction projects and it can be the main reason for project failures. Still, there is a need for studies focusing on causes of these delays. The objective of this article is to determine the factors with greatest influence on the backlog of real estate developments, improving the collective list of causes of delays in construction projects. A list of 24 probable causes was assembled and submitted as a survey for 47 professionals in administrative rolls from the building construction sector, more precisely, from private companies. The results were processed utilizing the Relative Importance Index (RII) ranking approach. The outcome shows that the most important delay causes are: rework, poor labor productivity, lack of qualified labor, unqualified labor, and project changes. The results also indicate that there are significant differences of opinion between the professionals of distinct hierarchy positions. The results obtained indicate that there is a transition between the opinions of professionals in different roles regarding the importance of influential factors in the delay of works, according to the managerial level of each group.
Subject
Industrial and Manufacturing Engineering,Business and International Management
Reference43 articles.
1. Causes of delay in building construction projects in Egypt;Abd El-Razek M. E.;Journal of Construction Engineering and Management,2008
2. Construction delays and their causative factors in Nigeria;Aibinu A. A.;Journal of Construction Engineering and Management,2006
3. A systems thinking approach to eliminate delays on building construction projects in South Africa;Aiyetan A.;Acta Structilia,2011
4. Understanding management roles and organisational behaviour in planning and scheduling based on construction projects in Oman;Al Nasseri H.;Journal of Construction in Developing Countries,2016
5. Construction delay: a quantitative analysis;Al-Momani A. H.;International Journal of Project Management,2000
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献