Study on the factors of delay in construction works

Author:

Carvalho André Brasil1,Maués Luiz Maurício Furtado1,Moreira Felipe de Sá1ORCID,Reis Caio José Losada1ORCID

Affiliation:

1. Universidade Federal da Pará, Brazil

Abstract

Abstract The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones.

Publisher

FapUNIFESP (SciELO)

Reference118 articles.

1. Construction delays in iranian civil engineering projects: an approach to the financial security of construction business;ABBASNEJAD B.;Life Science Journal,2013

2. Delay mitigation in the malaysian construction industry;ABDUL-RAHMAN H.;Journal of Construction Engineering and Management,2006

3. Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications;ADAM A.;Engineering, Construction and Architectural Management,2017

4. The professionals’ perspective on the causes of project delay in the construction industry;AGYEKUM-MENSAH G.;Engineering, Construction and Architectural Management,2017

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3