The professionals’ perspective on the causes of project delay in the construction industry

Author:

Agyekum-Mensah George,Knight Andrew David

Abstract

Purpose Construction project delays are described as a universal problem, which has led to many empirical studies. However, most of these studies were based on the rankings by respondents, and they were rarely verified. Therefore, the purpose of this paper is to explore professional perspectives on the causes of delay in the construction industry, where there has been little explicit consideration on this subject in recent decades. Design/methodology/approach A critical literature review and a qualitative approach was considered for a deeper and fresh understanding of the causes of delays, rather than recycling the existing themes and the risk of a statistically biased approach. A total of 41 interviews were undertaken which included the London Olympic 2012 project team. Findings In all, 32 themes were identified, which were categorised into 15 categories of causes of delay in the construction projects. Almost two-thirds of the main themes are not ranked top 15 causes of delay. These include knowledge and competence shortage, poor commercial decisions, unnecessary health and safety restrictions, poor risk management and poor space and logistics management. Research limitations/implications Due to the qualitative nature of the study, the findings might not be considered as representative. Practical implications The findings provide consideration of the causes of delay in the construction industry as seen by practitioners, which should provide guidance to enhance performance. Originality/value The study contributes to the better understanding of the causes of delays by using qualitative research strategy which is limited in the construction management literature. This study is an empirical investigation into the causes of delay in the twenty-first century and it represents an important edition to the body of knowledge within the subject area.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference59 articles.

1. Causes of delay in building construction project in Egypt;Journal of Construction Engineering and Management,2008

2. Agyekum-Mensah, G., Knight, A. and Pasquire, C. (2012), “Adaption of structured analysis design techniques methodology for construction project planning”, in Smith, S.D. (Ed.), Procs. 28th Annual ARCOM Conference, ARCOM, Edinburgh, pp. 1055-1065.

3. Causes of delays in Saudi Arabian public sector construction projects;Construction Management and Economics,2009

4. Construction delay: a quantitative analysis;International Journal of Project Management,2000

5. Reasons for delays in public projects in Turkey;Construction Management and Economics,1985

Cited by 78 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3