Abstract
Cluster tools are the key equipment in semiconductor manufacturing systems. They have been widely adopted for many wafer fabrication processes, such as chemical and physical vapor deposition processes. Reentrant wafer flows are commonly seen in cluster tool operations for deposition processes. It is very complicated to schedule cluster tools with reentrant processes. For a dual-arm cluster tool with two-time reentering, the existing studies point out that a one-wafer periodical (1-WP) schedule can be found, and it is optimal in terms of productivity. However, for some wafer fabrication processes, wafers should be processed at some PMs more than two times. This gives rise to a question of whether there still exists a 1-WP schedule for dual-arm cluster tools with the number of reentering times being more than two such that the cycle time of a tool can reach the lower bound. This problem is still open, and this is what this work wants to tackle. For a dual-arm cluster tool with the number of reentering times being k (>2) times, if there does not exist a value f ∈ {1, 2 …} such that k = 3f, theoretical proofs are given to show that a 1-WP schedule can be found, otherwise it does not exist. For cases with a 1-WP schedule, the cycle time can be obtained by analytical expressions. For the cases without a 1-WP schedule, two new methods for a three-wafer periodical schedule are proposed to improve the system productivity by comparing it with an existing three-wafer periodical schedule. The applications of the obtained results are demonstrated by examples. Wafer residency time constraints are required for some wafer fabrication processes. Note that the results obtained in this work cannot be directly applied to cluster tools with both reentrant wafer flows and wafer residency time constraints. Nevertheless, schedulablity and scheduling analyses for that applications can be conducted based on the obtained results in this work.
Funder
Science and Technology Development Fund
Macau SAR
Research Fund of Guangdong-Hong Kong-Macao Joint Laboratory for Intelligent Micro-Nano Optoelectronic Technology
Subject
Electrical and Electronic Engineering,Computer Networks and Communications,Hardware and Architecture,Signal Processing,Control and Systems Engineering
Reference39 articles.
1. Integrated Scheduling of a Dual-Armed Cluster Tool for Maximizing Steady Schedule Patterns;Kim;IEEE Trans. Syst. Man Cybern. Syst.,2021
2. Kim, Y., Lee, G., and Jeong, J. (2022). ML-Based JIT1 Optimization for Throughput Maximization in Cluster Tool Automation. Appl. Sci., 12.
3. Scheduling single-armed cluster tools with reentrant wafer flows;Lee;IEEE Trans. Semicond. Manuf.,2006
4. Feature extraction, condition monitoring, and fault modeling in semiconductor manufacturing systems;Bleakie;Comput. Ind.,2013
5. A Petri Net-Based Novel Scheduling Approach and Its Cycle Time Analysis for Dual-Arm Cluster Tools with Wafer Revisiting;Qiao;IEEE Trans. Semicond. Manuf.,2013
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献