Author:
Xu Fengxia,Zhang Xinyu,Ma Xingming,Mao Xinyu,Lu Zhongda,Wang Lijing,Zhu Ling
Abstract
To plan the work of power generation equipment, it is necessary to ensure that the power supply is sufficient and to achieve the minimum cost to ensure the safety and economy of the microgrid. Based on back propagation neural network–local mean decomposition–long short-term memory (BPNN–LMD–LSTM) load prediction, the design is based on a fixed-time consistency algorithm with random delay to predict the economic dispatch of microgrids. Firstly, the initial power load prediction sequence is obtained by continuous training of the back propagation neural network (BPNN); the residual sequence with other influencing factors is decomposed by local mean decomposition (LMD); and the long short-term memory neural network (LSTM) is used to predict the output prediction residual sequence, and the final short-term power load prediction is obtained. Based on predicting load, the fixed-time consistency algorithm with random delay is used to add supply and demand balance constraints to optimize the power distribution of the power generation units of the distributed microgrid and reduce the power generation cost of the microgrid. The results show that the prediction model has better prediction accuracy, and the scheduling algorithm based on the prediction model has a faster convergence rate to reach the lowest power generation cost.
Subject
Electrical and Electronic Engineering,Computer Networks and Communications,Hardware and Architecture,Signal Processing,Control and Systems Engineering
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献